| Rearranging the existing ladies toilets to provide attach toilet in the party room to RPFC of zonal office and M.S grill barricade alround the electrical panel board including easy access facility |
All India Radio |
Engineering |
40/EEC/CCW/AIR/CHN/NIT/18-19 Dated 19.12.18 |
|
| Face lift to entrance canopy of office block including Integral cement based water proofing treatment paint |
All India Radio |
Engineering |
AEC20/47 EEC/BNG/NIT/2018-19 |
|
| SUB: Repair/ Renovation work of Self Radiating MW Mast at All India Radio Ahmedabad. |
All India Radio |
All India Radio |
No. ENGP (200 KW MW DRM TR Ahmedabad Mast ) 11 TR /18-19 |
|
| Replacement of 250 KVA Transformer at AIR Bolangir. |
All India Radio |
Engineering |
Kol E/2018-2019/3(4)/1090 |
|
| Construction of Academic department block for TV Excellence Phase-1 under 12th Plan at SRFTI Kolkata(SH Early Fire alarm and Fire fighting System. |
All India Radio |
Engineering |
EE(E)KOL/NIT/29 of 2018-2019 |
|
| Engagement of Data Entry Operator for O/o the AE(E), CCW, AIR, Kolkata |
All India Radio |
Engineering |
17/AE E-/Kol/2018-19/ 588 |
|
| SITC of Copper Plate Grid Earthing and Copper Plate Earthing |
All India Radio |
All India Radio |
P 1 E Tender Earthing Bardhaman and Joranda 18-19 |
|
| Periodical Maintenance for Existing Desktop computer |
All India Radio |
Engineering |
SEE/NGP/CCW/AC/Computer/2018 19/801 |
|
| Providing vitrified tiles in Transmitter hall at HPT TV Kodaikanal |
All India Radio |
Engineering |
AE C/MDU/18-19/26/ |
|
| Corrigendum-Repair/Renovation work of Self Radiating MW Mast at All India Radio Rajkot. |
All India Radio |
Engineering |
ENGP (300 KW MW DRM TR Rajkot Mast ) 11 TR /18-19 |
|